Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›South Hook set for first LNG in 2016
Vessels

December 28, 2015 · about 10 years ago

South Hook set for first LNG in 2016

The South Hook LNG terminal is scheduled to receive the first Qatari LNG cargo of 2016 at the end of the week.

1 minutes read
  • LinkedIn
  • X
  • Email

The South Hook LNG terminal is scheduled to receive the first Qatari LNG cargo of 2016 at the end of the week.

According to the shipping data, the 216,000 cbm Al Gattara LNG carrier will dock at the jetty of the South Hook terminal located on the shores of the Milford Haven waterway on January 2.

The Q-Flex vessel was built by Hyundai Heavy Industries in 2007 for the LNG shipping giant Nakilat.

The South Hook terminal, owned by Qatar Petroleum, ExxonMobil and Total can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic metres of gas a year into the UK’s national transmission system.

[mappress mapid=”17876″]

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago