Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Petronas: PFLNG1 95 pct complete
Vessels

December 29, 2015 · about 10 years ago

Petronas: PFLNG1 95 pct complete

Petronas of Malaysia on Tuesday informed its first floating LNG unit, the PFLNG1, has reached the 95 percent completion mark.

1 minutes read
  • LinkedIn
  • X
  • Email

Petronas of Malaysia on Tuesday informed its first floating LNG unit, the PFLNG1, has reached the 95 percent completion mark.

According to a Petronas statement, the FLNG unit being built at South Korea’s Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, remains on target to commence operations in 2016.

Once completed, the FLNG will be moored in Kanowit gas field, located 180 kilometres offshore Sarawak, Malaysia and will produce 1.2 million tonnes of LNG per year.

The field is located 200 kilometers offshore Bintulu, East Malaysia, at a water depth of approximately 80 meters.

Petronas also laid the keel for its second floating LNG facility that is being built at Samsung Heavy Industry’s shipyard on Geoje Island at the end of October. The second FLNG unit will have a 1.5 mtpa production capacity and is expected to commission in 2018.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago