Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kingsbridge and Salcombe Estuary Dredging Starts This Month
Business & Finance

January 13, 2016 · about 10 years ago

Kingsbridge and Salcombe Estuary Dredging Starts This Month

Van Oord, a Dutch dredging company, has won the Kingsbridge and Salcombe Estuary dredging contract. The dredging operations could start as soon as 21st January – weather permitting, according to the Salcombe Harbor Authority. Adam Parnell, Harbor Master at Salcombe Harbor, said that the type of dred

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord, a Dutch dredging company, has won the Kingsbridge and Salcombe Estuary dredging contract.

The dredging operations could start as soon as 21st January – weather permitting, according to the Salcombe Harbor Authority.

Adam Parnell, Harbor Master at Salcombe Harbor, said that the type of dredging to be undertaken is known as water injection dredging. This is a proven technique for small-scale dredging or working at locations that are difficult to reach.

In this method, water is used to lift the sediment from the estuary floor so that the tides and other natural forces can disperse it over a wider area.

This cleanup project will be undertaken by the Van Oord’s water injection dredging vessel BORR.

The areas to be dredged include the Kingsbridge basin, an area around Lincombe Boatyard and several areas in and around Salcombe.

These include the slipway and pontoons in Batson Creek, the Fish Quay and the channel from there to Salcombe and the Normandy, Whitestrand and RNLI lifeboat pontoons.

Over 10,000 cubic meters of silt will be shifted over a number of outgoing tides. The dredging should take between one to two weeks to complete – weather permitting.

The Harbor Master added that the dredging campaign “ has been carefully planned and timed to cause minimum disruption to both harbor users and the environment.”

[mappress mapid=”21802″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago