Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›PHOTO: Heerema installs Marathon’s Alba B3 platform
Exploration & Production

January 20, 2016 · about 10 years ago

PHOTO: Heerema installs Marathon’s Alba B3 platform

Heerema Fabrication Group, the Netherlands-based manufacturer of large structures for the oil and gas industry, has informed through social media that the Alba B3 topside and jacket have been installed at the Alba field, offshore Equatorial Guinea. The platform sailed away from the Netherlands towar

1 minutes read
  • LinkedIn
  • X
  • Email

Heerema Fabrication Group, the Netherlands-based manufacturer of large structures for the oil and gas industry, has informed through social media that the Alba B3 topside and jacket have been installed at the Alba field, offshore Equatorial Guinea.

The platform sailed away from the Netherlands towards its offshore location in December 2015. The jacket was built at the company’s yard in Vlissingen and the topside was built at the Zwijndrecht yard under a contract awarded by the Houston-based oil and gas company Marathon Oil in April 2013.

The transportation and installation scope of work was conducted by the company’s sister division Heerema Marine Contractors. The company used the Thialf crane vessel for final offshore installation.

The platform was originally scheduled to be installed on the field by end-2015 with start-up expected in mid-2016.

The 5,800-tonne topside was mated with the 91-meter tall jacket weighing 2.600 tonnes some 32 kilometers offshore Malabo, Equatorial Guinea. The topside is 40 meters long and 40 meters wide with the height reaching 35 meters. The 33-meter-long, 4-legged jacket is 33 meters wide and 81 meters high.

The Alba 3 platform will compress gas from the existing Alba B2 platform through a 33-meter-long bridge connection. With this new platform, Marathon is expecting to boost production from the gas and condensate field.

Offshore Energy Today Staff

[mappress mapid=”3021″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

13 days ago