Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Balltec Delivers Plug Launcher for Åsgard Pipeline Project
Business & Finance

February 8, 2016 · about 10 years ago

Balltec Delivers Plug Launcher for Åsgard Pipeline Project

Balltec Engineered Solutions has completed work on Statoil’s infrastructure upgrade for the Åsgard Millom pipeline using its subsea smart plug launcher. Statoil asked Balltec to investigate the possibility of designing and manufacturing a subsea plug launcher during its work on a new lifting system

2 minutes read
  • LinkedIn
  • X
  • Email

Balltec Engineered Solutions has completed work on Statoil’s infrastructure upgrade for the Åsgard Millom pipeline using its subsea smart plug launcher.

Statoil asked Balltec to investigate the possibility of designing and manufacturing a subsea plug launcher during its work on a new lifting system for the Åsgard subsea gas compression project.

The plug launcher was built on technology used in Balltec’s recently developed flangeless subsea PIG launcher, a subsea tool used to deploy a PIG into a pipeline without the need for a bolted flange connection or diver intervention. The existing technology was re-designed to accommodate a larger smart plug of 4.5 m in length with a mass of 1500 kg. The plug launcher gripping mechanism was built to withstand pressure of up to 120 bar from within the pipeline.

Jon Jackson , Balltec engineering manager, said: “This is a unique piece of subsea equipment. The subsea plug launcher is flangeless and allows the insertion of plugs without any existing infrastructure by gripping and sealing the end of a cut pipe. The plug can be launched via a simple hydraulic system and operated with minimum ROV intervention. This allowed our client to have no production loss during tie-in.”

The whole project was delivered to Technip, the installation contractor. The plug launcher was successfully deployed and used in the Åsgard field in August 2015.

Gunnar Paulson , senior technical advisor at Statoil, said: “The Balltec Plug Launcher was used for launching a Smart Plug into a producing 20” pipeline at the Åsgard field in Norway. The objective was to isolate the gas producing part of the pipeline from the water filled section at the end, facilitating installation of a pipeline end module while the main part of the pipeline was in normal production. The technology went through an extensive development and testing process before the launcher was qualified by Statoil for operation on a live pipeline. Several parties contributed to a safe and successful launching operation this summer. Statoil would like to thank Balltec for their efficient design, fabrication and testing of the Plug Launcher.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free