Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ravestein Builds World’s Largest Backhoe for Boskalis
Business & Finance

March 8, 2016 · about 10 years ago

Ravestein Builds World’s Largest Backhoe for Boskalis

The new backhoe dredger Magnor, currently being built for Boskalis by Ravestein, will be the largest and most efficient backhoe dredger in the world. Two large deck cranes are fitted for work on- and changing of the equipment (boom, stick and bucket) of the excavator. The vessel includes all the nec

2 minutes read
  • LinkedIn
  • X
  • Email

The new backhoe dredger Magnor, currently being built for Boskalis by Ravestein, will be the largest and most efficient backhoe dredger in the world.

Two large deck cranes are fitted for work on- and changing of the equipment (boom, stick and bucket) of the excavator.

The vessel includes all the necessary equipment such as a large deck workshop, stores, machinery and an accommodation fully outfitted to receive a crew of eight.

With the spuds of 40 m length, she will be able to dredge to depths of 32 m. The biggest bucket will have a capacity of 45 m3, nearly 1½ times the volume of a 20’ ISO container.

One of the spuds located fore is mounted in a carrier to move it precisely whilst working.

The excavator, based on a Caterpillar 6090, was completely re-built by and to suit Boskalis needs. The total installed power on the excavator is 4,100 kW.

The bucket of the Magnor will be able to lift no less than 67,000 kilograms of dredged material.

The complete lifting section with the boom, the stick, the hydraulic cylinders and the bucket were developed by Boskalis.

An interesting innovation is the use of water cooling for the engines and hydraulics. That delivers huge improvements in terms of fuel consumption and, above all, noise reduction.

The detailed design of the dredger was provided in-house by Ravestein in close cooperation with the Boskalis team. The dredger and all its components are built according to Bureau Veritas classification.

The Magnor was launched mid-February and planned delivery to Boskalis is scheduled for April 2016.

With the dimensions of 72.0 x 20.4 x 5.5 meters, the Magnor will be larger than any other backhoe dredger.

[mappress mapid=”22065″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago