Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›RVO Picks Fugro for Hollandse Kust Zuid Soil Investigation
Authorities & Government

March 9, 2016 · about 10 years ago

RVO Picks Fugro for Hollandse Kust Zuid Soil Investigation

Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland or RVO), part of the Dutch Ministry of Economic Affairs, has awarded Fugro Survey B.V. with a contract to carry out geophysical soil investigations for the proposed offshore wind farm sites at Hollandse Kust Zuid (South). Fugro Su

2 minutes read
  • LinkedIn
  • X
  • Email

Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland or RVO), part of the Dutch Ministry of Economic Affairs, has awarded Fugro Survey B.V. with a contract to carry out geophysical soil investigations for the proposed offshore wind farm sites at Hollandse Kust Zuid (South).

Fugro Survey was one of nine applicants to the tender released back in December 2015.

The company has already started preliminary site investigation. Geophysical surveys will be performed from the 54-metre multi-purpose survey vessel, Fugro Pioneer, and the 40-metre Victor Hensen. The work will take place over a period of 3 to 4 weeks and will focus on mapping the seabed characteristics and sub-surface soil conditions.

Following the execution of the contract, valued at EUR 1.5 million, the data gathered will be made available to the participants in the SDE+ concession tenders for offshore wind farm zones in the Dutch part of the North Sea.

The SDE+ (Stimulering Duurzame Energieproductie/Stimulation of sustainable energy production) is an operating grant which encourages the production of renewable energy in the Netherlands.

The Netherlands has six offshore wind sites in the pipeline at two Hollandse Kust zones: four at Hollandse Kust Zuid, and two at Hollandse Kust Noord.

Each of the sites at the wind farm zones can accommodate 350MW. TenneT will build grid connections and construct offshore substations.

The subsidy and permit tender for sites Hollandse Kust Zuid I & II is planned to open in 2017, and Hollandse Kust Noord is scheduled for the process in 2019.

Offshore WIND Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago