Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›PHOTO: Culzean WHP Jacket Ready for Sail Away
Equipment

March 23, 2016 · about 10 years ago

PHOTO: Culzean WHP Jacket Ready for Sail Away

The wellhead platform (WHP) jacket for Maersk Oil’s Culzean field has been loaded onto a barge at Heerema’s Vlissingen yard in preparation for a spring sail away. Heerema Fabrication Group started building the jacket in 2015, and as planned, the jacket is ready for sail away ahead of drilling startu

1 minutes read
  • LinkedIn
  • X
  • Email

The wellhead platform (WHP) jacket for Maersk Oil’s Culzean field has been loaded onto a barge at Heerema’s Vlissingen yard in preparation for a spring sail away.

Heerema Fabrication Group started building the jacket in 2015, and as planned, the jacket is ready for sail away ahead of drilling startup on the project in Q2 2016.

The jacket, designed by Ramboll, is approximately 114 m tall with a footprint of 31 x 31 m and a top of 22 x 22 m.

The jacket is a part of wellhead platform, which along with a central processing facility platform and a separate utilities and living quarter platform will be part of Culzean field.

The Culzean field is situated in the UK sector of the Central North Sea approximately 200 km east of Aberdeen in license block 22/25a. The water depth is approximately 88 m and the reservoir is located around 4,300 m below sea level.

Maersk Oil received an approval for the field development from the UK Oil & Gas Authority in August 2015.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free