Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Sonangol Sambizanga heading to pick up Angola LNG cargo?
Vessels

April 8, 2016 · about 10 years ago

Sonangol Sambizanga heading to pick up Angola LNG cargo?

Chevron-led Angola LNG project could ship a cargo of chilled gas in the coming weeks as an LNG tanker is heading towards the plant in Soyo, shipping data showed. This would be the first cargo of chilled gas to leave the Soyo LNG export plant since the project was shut down in April 2014 after [&hell

2 minutes read
  • LinkedIn
  • X
  • Email

Chevron-led Angola LNG project could ship a cargo of chilled gas in the coming weeks as an LNG tanker is heading towards the plant in Soyo, shipping data showed.

This would be the first cargo of chilled gas to leave the Soyo LNG export plant since the project was shut down in April 2014 after a major rupture on a flare line. The $10 billion LNG project started recommissioning process in January this year.

The 160,500-cbm LNG tanker Sonangol Sambizanga is expected to dock at the liquefaction and export plant in Soyo around April 15, according to AIS data provided by the vessel tracking website, MarineTraffic.

Chevron did not respond to an email by LNG World News seeking comment on the matter by the time this article was published.

Earlier this year, Chevron’s CEO John Watson said the company expects to ship first LNG cargo during the second quarter of this year. According to Watson, most of the first production from Angola LNG will be sold on spot market.

Angola LNG also recently signed a “flexible” deal with EDF Trading, a unit of EDF, under which it will deliver multiple cargoes on an ex-ship basis (DES) from 2016 through to 2018.

The LNG plant in Soyo is a single-train facility able to produce 5.2 million tonnes per year. Angola LNG also has a dedicated fleet of seven LNG tankers.

Angola LNG is a joint venture between Chevron (36.4%), Sonangol (22.8%), BP (13.6%), Eni (13.6%), and Total (13.6%).

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

26 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

26 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

26 days ago