Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Grab Hopper ‘Dredger-1’ Ready for the Action
Business & Finance

April 21, 2016 · about 10 years ago

Grab Hopper ‘Dredger-1’ Ready for the Action

In mid-April of 2016, the Indian Navy’s grab hopper dredger, Dredger-1 was preparing to depart its birth shipyard following a comprehensive one-year warrantee review. Tebma Shipyards Senior Vice President, M. Balasubramaniam, explained that the 44.15 by 12.2-meter vessel was designed to meet precise

1 minutes read
  • LinkedIn
  • X
  • Email

In mid-April of 2016, the Indian Navy’s grab hopper dredger, Dredger-1 was preparing to depart its birth shipyard following a comprehensive one-year warrantee review.

Tebma Shipyards Senior Vice President, M. Balasubramaniam, explained that the 44.15 by 12.2-meter vessel was designed to meet precise deepening requirements around docks and port installations and in riverine or other places where deepening of specific areas is required.

The vessel has a 320-HP Cummins-855-powered forward-mounted crane supplied by Titagarth Wagons. The crane’s 15.2-meter boom has a working radius of 12 meters and hoisting capacity of 10.5 tonnes at a 46-degree boom angle.

The crane’s grab bucket has a 3-cubic meter capacity to hold 4.5 tonnes of dredge materials. The crane is capable of dredging in depths up to ten meters. The crane transfers the dredged material to the ship’s hopper which is of 300 cubic meter capacity, (500 tonnes).

The dredged material in the hopper id dumped at open through a set of eight hopper doors controlled by hydraulic rams and chains over pulleys.

The main propulsion for the dredger is a pair of Cummins KTA38-M engines each producing 1000 HP at 1800 RPM. These engines are built in India and meet the Indian Navy’s policy of supporting domestic suppliers.

With the one-year warrantee review completed, the Dredger-1, has left the Tebma Shipyard and will resume duties with the Indian Navy at Naval Dockyard, Mumbai.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago