Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Basslink Repairs On Schedule
Business & Finance

April 25, 2016 · about 10 years ago

Basslink Repairs On Schedule

Basslink’s operator informed that cable repair vessel, the Ile de Re, is returning to Geelong after it wrapped up the first of three jointing exercises. “We are very pleased to report that the first joint has been completed, with 1355m of new cable laid on the seabed,” said Basslink CEO Malcolm Eccl

1 minutes read
  • LinkedIn
  • X
  • Email

Basslink’s operator informed that cable repair vessel, the Ile de Re, is returning to Geelong after it wrapped up the first of three jointing exercises.

“We are very pleased to report that the first joint has been completed, with 1355m of new cable laid on the seabed,” said Basslink CEO Malcolm Eccles . “The works went well, and we are on track for return to service in June as previously advised”

According to Eccles, the next phase of the operations should be the final major mobilisation, which will include the loading of a 90-tonne reel of high voltage cable, amongst other procedures to equip the vessel.

After the mobilisation, which is expected to take five days, the operator said it plans to return to the fault location, where it should complete the final two joints and lay the remaining cable and bight.

Subsea World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free