Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Nigeria’s Aje field gears up for full production
Project & Tenders

May 25, 2016 · about 10 years ago

Nigeria’s Aje field gears up for full production

Independent exploration and production company Panoro Energy has informed that the FPSO commissioning activities on the Aje field offshore Nigeria are being finalized, focused on preparation of the 72 hour production test for the FPSO to go on hire, expected to be conducted in the near future. To re

2 minutes read
  • LinkedIn
  • X
  • Email

Independent exploration and production company Panoro Energy has informed that the FPSO commissioning activities on the Aje field offshore Nigeria are being finalized, focused on preparation of the 72 hour production test for the FPSO to go on hire, expected to be conducted in the near future.

To remind, first oil production from the Aje field started on May 3, 2016, following a hook-up of the FPSO Front Puffin to the pre-installed STP buoy. The field, located in the OML 113 license, is operated by Yinka Folawiyo Petroleum company (YFP), and Panoro is its partner in the licence.

Panoro Energy said on Wednesday in its 1Q 2016 report that, after the production started, both Aje 4 and Aje 5 wells have been brought on stream at varying choke rates. Each of Aje 4 and Aje 5 has produced in excess of 5,000 bopd on a 32/64” choke, with good well head pressure. Gas lift has not as yet been used, said Panoro.

According to Panoro, stabilized combined flow rates will be determined in the coming weeks, in conjunction with final mechanical optimization, commissioning, and the Nigerian regulatory approval process. The flow rates exhibited to date indicate a highly productive reservoir, the company noted.

Meanwhile geological models of the Aje field have been revised, incorporating the new 3D seismic and the Aje-5 well data. This work supports the previously reported reserves and contingent resources volumes but with more confidence around the shape of the Cenomanian reservoir, the company stated.

This allows, Panoro said, more precise planning for future Phase 2 drilling to be carried out, and possible well locations for Aje-6 and Aje-7 have been identified.

Panoro Energy on Wednesday also reported a net loss of $18.2 million for the first quarter 2016, compared to a loss of $2.2 million in the same period in 2015.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free