Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PHOTO: Jack-up Maersk Highlander heads for Culzean field
Fossil Energy

June 30, 2016 · about 10 years ago

PHOTO: Jack-up Maersk Highlander heads for Culzean field

Maersk Drilling’s jack-up drilling rig, the Maersk Highlander, has set off on its voyage to the Culzean gas field in the UK sector of the North Sea. The newbuild harsh environment jack-up rig will work for Maersk Oil on its operated Culzean gas field. Maersk Drilling informed through social media ch

2 minutes read
  • LinkedIn
  • X
  • Email

Maersk Drilling’s jack-up drilling rig, the Maersk Highlander, has set off on its voyage to the Culzean gas field in the UK sector of the North Sea.

The newbuild harsh environment jack-up rig will work for Maersk Oil on its operated Culzean gas field.

Maersk Drilling informed through social media channels on Wednesday that the jack-up rig has set sail towards its North Sea location. The rig is being transported by a Dockwise heavy transport vessel.

To remind, the drilling contractor acquired the newbuild rig from financially troubled Hercules Offshore in late May after Hercules was urged by Jurong Shipyard to take delivery of and pay for the rig. Soon after, Maersk Drilling took delivery of the rig from the shipyard in Singapore.

The rig came with a five-year drilling contract on the Culzean field valued around $420 million, including a mobilization fee of $9m.

Maersk Highlander is of a Friede & Goldman JU2000E, categorized as a 400ft rig, with 30,000ft drilling depth and HPHT (High-Pressure High-Temperature) capabilities. It has accommodation capacity for up to 150 personnel.

The overall Culzean development concept consists of a wellhead platform, a central processing facility platform, and separate utilities and living quarter platform with capacity for over 100 people. The platforms will be linked via two bridges approximately 100 meters in length. First gas is currently expected in 2019.

A wellhead jacket for the Culzean field’s wellhead platform was installed at its North Sea location in mid-May by Heerema Marine Contractors.

Maersk Oil has 49.99% interest in the field, and its partners are JX Nippon and Britoil, a subsidiary of BP. Britoil recently doubled its stake in the Culzean field by acquiring 16% interest from JX Nippon thus boosting its interest to a total of 32%.

Maersk Highlander is on its way to the #Culzean gas field in the #NorthSea to work for @maerskoil and its partners. pic.twitter.com/1FEnM3OTU5

— Maersk Drilling (@maerskdrilling) June 29, 2016

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free