Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Dutch Government Pinpoints Two Areas for 2.1GW of Offshore Wind
Authorities & Government

July 5, 2016 · about 10 years ago

Dutch Government Pinpoints Two Areas for 2.1GW of Offshore Wind

Hollandse Kust Zuid (South) and Hollandse Kust Noord (North) offshore wind zones, totalling 2.1GW of potential offshore wind capacity, have been selected for the construction of offshore wind farms by the Dutch government in an effort to reach the goal of 16% of renewable energy in the country’s ene

2 minutes read
  • LinkedIn
  • X
  • Email

Hollandse Kust Zuid (South) and Hollandse Kust Noord (North) offshore wind zones, totalling 2.1GW of potential offshore wind capacity, have been selected for the construction of offshore wind farms by the Dutch government in an effort to reach the goal of 16% of renewable energy in the country’s energy mix by 2023.

Hollandse Kust Zuid, covering 356 km² in total, will be divided into four sites, each capable of accommodating 350MW of offshore wind capacity, while Hollandse Kust Noord will consist of two 350MW sites.

The subsidy and permit tender for Hollandse Kust Zuid I and II (totalling 700MW) is planned to open in 2017, with the tender for the zones III and IV following a year later. The Hollandse Kust Noord subsidy and permit tender is scheduled for 2019.

Fugro has been awarded the contract to execute the metocean measurement campaign at Hollandse Kust Zuid. In June, two buoys were deployed in the centre of the wind farm zone for a metocean measurement campaign that will last at least a year.

The two areas, located within the so-called 12-mile zone between 18.5 and 22 kilometers from the coast and adjacent to previously designated areas outside the 12-mile zone, have been outlined in the Draft Public Structure for Offshore Wind (Ontwerp-Rijksstructuurvisie Windenergie op Zee), which will be open for public input and comments from 19 August with the government aiming to make a final decision by the end of 2016.

Offshore WIND Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & Government

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

23 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

23 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

24 days ago