Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Last Nobelwind Foundation Pieces Arrive to Port of Ostend
Ports & Logistics

July 13, 2016 · about 10 years ago

Last Nobelwind Foundation Pieces Arrive to Port of Ostend

The last 10 foundation components for the Nobelwind project arrived onboard the vessel Drago J to the port of Ostend on 7 July. The REBO terminal at Energy Port Oostende has been in full operation for a few months now. As of March, foundation components have been arriving on the REBO site every 2 to

1 minutes read
  • LinkedIn
  • X
  • Email

The last 10 foundation components for the Nobelwind project arrived onboard the vessel Drago J to the port of Ostend on 7 July.

The REBO terminal at Energy Port Oostende has been in full operation for a few months now. As of March, foundation components have been arriving on the REBO site every 2 to 3 weeks for final assembly.

Nobelwind, a consortium between the Japanese conglomerate Sumitomo, the Dutch investor Meewind, and Parkwind, has installed the offshore grid which is operational and connected to Elia’s Zeebrugge substation.

The developer has appointed Jan De Nul as the EPCI contractor for the installation of all foundations, as well as the fifty 3.3MW MHI Vestas wind turbines.

The installation of foundations is expected to last until the beginning of September, subject to weather conditions.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

14 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago
Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

14 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago