Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Update on the Napa River Dredging Project
Business & Finance

July 13, 2016 · about 10 years ago

Update on the Napa River Dredging Project

The official kickoff of the Napa River dredging project is expected in mid-September. According to a spokesman from the U.S. Army Corps of Engineers, the dredging scheme has been scheduled for mid-September and will last through November. The dredging will remove around 300,000 cubic yards of sedime

1 minutes read
  • LinkedIn
  • X
  • Email

The official kickoff of the Napa River dredging project is expected in mid-September.

According to a spokesman from the U.S. Army Corps of Engineers, the dredging scheme has been scheduled for mid-September and will last through November.

The dredging will remove around 300,000 cubic yards of sediment from a 13-mile stretch of the river, starting from the Third Street bridge in Napa – the upper limit of the navigable channel – south to Highway 37 in Vallejo.

Material removed during the project will be deposited at various sites, including lands off Imola Avenue and Milton Road.

The project, which will concentrate on shallow spots hazardous to watercraft, will be the federal agency’s first maintenance of the waterway since 1998.

The Napa River Channel is a shallow draft channel approximately 16 miles long, that is mainly used for light commercial and recreational navigation. The channel extends from the City of Vallejo, which is located on San Pablo Bay, northward to the City of Napa.

[mappress mapid=”22689″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free