Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Erin Energy to Give Nitrogen Boost to Oyo-7 Well
Operations & Maintenance

August 9, 2016 · about 10 years ago

Erin Energy to Give Nitrogen Boost to Oyo-7 Well

During the second quarter of 2016, Erin Energy brought Oyo-8 well back online using a light well intervention (LWI) vessel, following a failure of the sub-surface controlled sub-surface safety valve (SCSSV). The Island Constructor vessel carried out the LWI service on the Oyo-8 well to open the SCSS

2 minutes read
  • LinkedIn
  • X
  • Email

During the second quarter of 2016, Erin Energy brought Oyo-8 well back online using a light well intervention (LWI) vessel, following a failure of the sub-surface controlled sub-surface safety valve (SCSSV).

The Island Constructor vessel carried out the LWI service on the Oyo-8 well to open the SCSSV, which failed to re-open after a scheduled production curtailment in the Oyo field.

Following the restart, the well has been reported of achieving net average daily oil production of 5,400 barrels per day, compared to 1,800 barrels per day in Q1, 2016.

Reportedly, the Oyo-8 is currently producing more than 7,000 barrels of oil per day.

Furthermore, Erin Energy informed that the Oyo-7 well could not come back on production naturally, after an emergency shut down that occurred on July 01, 2016.

This is due to high water production from the well and this has resulted in a temporary production loss of about 1,400 barrels of oil per day.

The company is currently said to be making plans to bring Oyo-7 well back by introducing nitrogen from the production facilities via subsea infrastructure to the well.

The nitrogen lift will take place mid-August, the company noted.

Erin Energy also plans Oyo-9 production well as an additional development within the central area of the Oyo field in Oil Mining Lease 120 which will be tied into the existing production facilities to increase the production by approximately 6,000 – 7,000 barrels of oil per day.

The company is said to be in the process of identification of a drilling rig and the procurement of long-lead well and subsea equipment for the next drilling campaign, planned for the fourth quarter of this year.

Subsea World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free