Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›China’s CNPC hires Frigstad Shekou offshore drilling rig
Business & Finance

August 17, 2016 · about 10 years ago

China’s CNPC hires Frigstad Shekou offshore drilling rig

China’s oil giant CNPC has hired Frigstad Offshore’s semi-submersible drilling rig Frigstad Shekou. This is Frigstad’s first of two drilling rigs under construction at China’s Yantai CIMC Raffles yard. With the length of 117m, width of 92.7m and height of 118m, Frigstad Shekou is equipped with DP3 d

1 minutes read
  • LinkedIn
  • X
  • Email

China’s oil giant CNPC has hired Frigstad Offshore’s semi-submersible drilling rig Frigstad Shekou.

This is Frigstad’s first of two drilling rigs under construction at China’s Yantai CIMC Raffles yard.

With the length of 117m, width of 92.7m and height of 118m, Frigstad Shekou is equipped with DP3 dynamic positioning system and classed by DNV. The rig’s deepest drilling depth is up to 15,240 meters and operation depth up to 3.658 meters.

The rig is set to begin sea trials in September. The delivery is expected at the end of 2016 when it will start operation for China National Petroleum Corporation Offshore Engineering Company (CPOE), a subsidiary of CNPC.

Frigstad’s second semi-sub, the Frigstad Kristiansand, remains under construction at the Chinese shipyard.

To remind, Frigstad ordered two 7th generation drilling units of the Frigstad D90 design from CIMC Raffles in January 2013, with options for another four units.

According to the original deal, the first two drilling rigs were initially scheduled for delivery at the end of 4Q 2015 and 2Q 2016, respectively, and the total project cost was approximately $1.3 billion.

The delivery dates were later postponed with Frigstad Shekou now moved for the end of 2016, and Frigstad Kristiansand pushed to 2017.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago