Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›LNG container vessel project enters second phase
Vessels

September 8, 2016 · about 10 years ago

LNG container vessel project enters second phase

GTT, CMA CGM and DNV GL signed a cooperation agreement with new project participants ABB, the Caterpillar company Solar Turbines, and OMT for phase two of the PERFECt project.

2 minutes read
  • LinkedIn
  • X
  • Email

GTT, CMA CGM and DNV GL signed a cooperation agreement with new project participants ABB, the Caterpillar company Solar Turbines, and OMT for phase two of the PERFECt project.

The Piston Engine Room Free Efficient Containership project investigates the possibility of using a combined gas and steam turbine system (COGAS) to power an ultra large container vessel (ULCS).

The first phase of the project performed by GTT, CMA Ships, a unit of CGM, and DNV GL showed “promising results with regard to the commercial competitiveness of the design compared to an LNG-fuelled ship with a conventional propulsion system,” DNV GL said in its statement.

The aim of the second phase of the project is to detail the technical concept and the commercial feasibility.

“The results of the first phase prove not only that the project is technically and economically viable, but also that the proven technologies can be deployed to make the PERFECt project a reality”, says Philippe Berterottière , chairman and CEO of GTT.

Knut Ørbeck-Nilssen , CEO of DNV GL – Maritime added that as LNG bunkering stations continue to grow in numbers and global coverage, projects that push the efficiency envelope on LNG-powered vessels could result in significant market advantages for first movers.

PERFECt phase two will build on the results of the original study which was launched in 2015. Some of the focus areas for phase two are process technology optimization of the COGAS system including the steam turbine, use of the available cooling capacity of the LNG, and further optimization of the ship design to attain greater efficiency and increased cargo capacity, the statement reads.

In phase one of the project, GTT, CMA CGM (and its subsidiary CMA Ships) and DNV GL released a technical and feasibility study for a COGAS-powered LNG-fuelled electrically driven mega box ship.

Based on the results of that study, the PERFECt vessel design was found to offer potentially increased cargo capacity, greater layout flexibility and reduced maintenance costs than comparable conventionally powered HFO and LNG designs, according to the project participants.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

27 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

27 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

27 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

27 days ago