Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Hurricane Completes Testing of Lancaster Pilot Well
Operations & Maintenance

September 9, 2016 · about 10 years ago

Hurricane Completes Testing of Lancaster Pilot Well

Hurricane Energy has completed the testing and logging phase of the 205/21a-7 well, the ‘Pilot well’, and operations are now progressing to permanently abandon the well reservoir section prior to side-tracking the top-hole to form the the ‘Horizontal well’. Preliminary third party analysis from the

1 minutes read
  • LinkedIn
  • X
  • Email

Hurricane Energy has completed the testing and logging phase of the 205/21a-7 well, the ‘Pilot well’, and operations are now progressing to permanently abandon the well reservoir section prior to side-tracking the top-hole to form the the ‘Horizontal well’.

Preliminary third party analysis from the Pilot well indicates a hydrocarbon column of at least 620 meters is present within the basement extending well below structural closure confirming Hurricane’s reservoir model for the Lancaster field, located West of Shetland.

Wireline and well test data indicates that there are no pressure barriers detected in the reservoir.

DST testing of the basement reservoir yielded a maximum, natural flow rate of 6,600 bopd and a maximum flow rate of 11,000 bopd (artificial lift with an electrical submersible pump) of good quality 38 API oil with no formation water produced.

According to Hurricane, the next stage of operations involves drilling of the Horizontal well.

This is designed to provide a second future production well and additional information to help optimally plan the Lancaster field development, the company explained

Dr Robert Trice , Hurricane’s CEO, said: “I am delighted that the Pilot well has confirmed a significant oil column deeper than the 2C case set out in the company’s CPR. Our initial assessment of the well results, which are subject to refinement of the provisional data, suggest that the Lancaster field is likely to be significantly greater than the 200mm bbls 2C case. ”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free