Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Spotted: World’s First Wind Turbine Components Carrier Opens Wide
Shipbuilding

December 2, 2016 · about 9 years ago

Spotted: World’s First Wind Turbine Components Carrier Opens Wide

Wind turbine manufacturer Siemens Wind Power has presented the world’s first heavy cargo Roll on/Roll off (RoRo) vessel custom designed to transport wind turbine components at the Port of Esbjerg in Denmark. The 141-metre long Rotra Vente, designed by Deugro Denmark, will be used to transport wind t

1 minutes read
  • LinkedIn
  • X
  • Email

Wind turbine manufacturer Siemens Wind Power has presented the world’s first heavy cargo Roll on/Roll off (RoRo) vessel custom designed to transport wind turbine components at the Port of Esbjerg in Denmark.

The 141-metre long Rotra Vente, designed by Deugro Denmark, will be used to transport wind turbine components such as blades and nacelles from Siemens Wind Power’s manufacturing facilities in Hull, UK, and Cuxhaven, Germany, to Esbjerg and other installation ports and harbors in the North and Baltic Seas.

Designed from a base of an existing hull of a container ship, the vessel was rebuilt for its new purpose at Holland Shipyard in Hardinxveld-Giessendam in the Netherlands.

Part of its new equipment is a large bow door that allows RoRo access to the restructured cargo deck. The deck is covered by a telescopic roof to protect the nacelles from salty seawater spray during transportation. Since the roof can be opened, Rotra Vente’s cargo can also be loaded via cranes at harbors without a RoRo ramp.

Rotra Vente’s sister ship, a transporter for towers and blades, is already under construction.

This vessel, the Rotra Mare, is expected to be completed in the first quarter of 2017. She will accommodate up to 12 wind turbine rotor blades and transport them from Siemens’ production facilities in Hull, England or Aalborg, Denmark to the respective installation harbor.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free