Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Morro Bay Harbor Dredging Project Well Underway
Business & Finance

February 13, 2017 · about 9 years ago

Morro Bay Harbor Dredging Project Well Underway

The $4.37 million Morro Bay Harbor dredging project is well underway, reports the U.S. Army Corps of Engineers, Los Angeles District. Under this project, which USACE awarded to Ahtna Design-build Corporation earlier in 2016, crews will remove approximately 240,000 cubic yards of clean sand and grave

1 minutes read
  • LinkedIn
  • X
  • Email

The $4.37 million Morro Bay Harbor dredging project is well underway, reports the U.S. Army Corps of Engineers, Los Angeles District.

Under this project, which USACE awarded to Ahtna Design-build Corporation earlier in 2016, crews will remove approximately 240,000 cubic yards of clean sand and gravel from the entrance channel, sand trap and main channels at Morro Bay Harbor.

According to the Corps, the contractor is currently pumping about 400 cubic yards of sand p/hour out of the navigational channel. The pipeline extends north from Coleman Beach down to State Parks Property on Morro Strand State Beach.

The City of Morro Bay expects that the entire project should take approximately 2-3 months to complete, depending on the production rates.

[mappress mapid=”23601″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free