Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›ExxonMobil to Extend Sigyn Field Lifetime
Operations & Maintenance

February 24, 2017 · about 9 years ago

ExxonMobil to Extend Sigyn Field Lifetime

ExxonMobil has received Petroleum Safety Authority (PSA) consent to extend the lifetime of the facilities on the Sigyn field. The field, developed using a subsea solution, with the wellstream piped through two lines to the Sleipner A facility, was originally estimated to last until 2017. The most re

1 minutes read
  • LinkedIn
  • X
  • Email

ExxonMobil has received Petroleum Safety Authority (PSA) consent to extend the lifetime of the facilities on the Sigyn field.

The field, developed using a subsea solution, with the wellstream piped through two lines to the Sleipner A facility, was originally estimated to last until 2017.

The most recent calculations show that it can be sustained until 2022.

ExxonMobil, the operator of the Sigyn, has therefore applied for consent to extend the lifetime of the subsea facility at Sigyn and the associated wells, pipelines and control cables for managing and monitoring the wells.

“We have granted ExxonMobil consent to extend the lifetime until December 31, 2022,” PSA said.

The Sigyn field is located around 12 kilometers south-east of Sleipner Øst in the North Sea.

Production from the field began in 2012.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free