Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Statoil’s Njord A platform to get Rolls-Royce’s mooring system
Business & Finance

April 20, 2017 · about 9 years ago

Statoil’s Njord A platform to get Rolls-Royce’s mooring system

Rolls-Royce has been chosen by Norway-based engineering and construction services firm Kvaerner to provide a mooring system for Norwegian oil and gas company Statoil’s oil platform, Njord A. Njord A is being upgraded by Kvaerner and Rolls-Royce said on Thursday it has been chosen to provide an upgra

2 minutes read
  • LinkedIn
  • X
  • Email

Rolls-Royce has been chosen by Norway-based engineering and construction services firm Kvaerner to provide a mooring system for Norwegian oil and gas company Statoil’s oil platform, Njord A.

Njord A is being upgraded by Kvaerner and Rolls-Royce said on Thursday it has been chosen to provide an upgrade to its mooring system. The contract has a value of about £15 million ($19.2M), the company said.

Njord A is a semi-submersible floating steel platform, with an integrated deck with drilling and processing facilities, as well as living quarters. It is normally located in the Njord oilfield, around 130 km northwest of the city Kristiansund and 30 km west of the Draugen field.

Today, Njord A has a 12-point mooring system which will be upgraded to a modern 17-point system. Rolls-Royce will supply low pressure hydraulic driven winches, fairleads and a control system. The semi-submersible four-column production platform will be moored at about 330m water depth.

The delivery from Rolls-Royce is scheduled for 2018. The platform is planned to be back in operation offshore in 2020 and to operate for another 20 years.

The platform upgrade is part of a project Statoil has named “Njord Future,” intended to prolong the lifespan of the Njord field.

Knut Hovland , Rolls-Royce, Director of Customer & Services – Marine, said: “We are proud to be part of this extensive upgrade program. It is the first time in the Norway’s history as an oil producing country that a platform is being towed to shore for an extensive upgrade. Previous upgrades have been done offshore.”

Njord A was originally delivered in 1997 by the organization which is today Kvaerner. The topside was produced at Stord, while the hull was fabricated at Verdal, both on the west coast of Norway. The platform was towed offshore only 28 months after cutting of the first steel plates.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free