Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Burbo Bank Extension Fully Commissioned
Operations & Maintenance

April 27, 2017 · about 9 years ago

Burbo Bank Extension Fully Commissioned

The testing of the last MHI Vestas 8MW turbine on the Burbo Bank Extension offshore wind farm was completed this month and the wind farm has been fully commissioned, DONG Energy said.

1 minutes read
  • LinkedIn
  • X
  • Email

The testing of the last MHI Vestas 8MW turbine on the Burbo Bank Extension offshore wind farm was completed this month and the wind farm has been fully commissioned, DONG Energy said.

A2SEA’s jack-up Sea Installer installed the first of the 32 turbines at the site located some 7 kilometres off Liverpool Bay in September 2016, and the final turbine went up in December 2016. The wind farm produced its first power in November 2016.

The 258MW Burbo Bank Extension has now become the first wind farm in the world to use 8MW turbines on a commercial scale.

The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S (25%).

Burbo Bank Extension and the neighbouring 90MW Burbo Bank wind farm will be operated from a new operations and maintenance (O&M) facility in Kings Wharf, Seacombe, Merseyside. The facility is expected to be completed by mid-2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free