Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen Cutter Suction Dredger 350 Delivered to Heuvelman Ibis
Business & Finance

May 1, 2017 · about 9 years ago

Damen Cutter Suction Dredger 350 Delivered to Heuvelman Ibis

A Damen cutter suction dredger (CSD) 350 has been delivered from Damen Dredging Equipment in Nijkerk, the Netherlands, to start work on a canal dredging assignment in the province of Groningen, in the north of the country. In order to execute the project, which involves the extraction of approximate

2 minutes read
  • LinkedIn
  • X
  • Email

A Damen cutter suction dredger (CSD) 350 has been delivered from Damen Dredging Equipment in Nijkerk, the Netherlands, to start work on a canal dredging assignment in the province of Groningen, in the north of the country.

In order to execute the project, which involves the extraction of approximately 220,000m³ of sediment from the Winschoterdiep canal, the Netherlands-based marine contractor Heuvelman Ibis required a heavy-duty dredger at short notice.

Two Damen BS 350 booster stations to enable pumping over long distances were also included in the order, placed in January.

Prior to delivery a number of options were added to the CSD 350 so as to optimize it for the project. These included a spud carriage pontoon to further boost production, and also the addition of anchor booms to allow unassisted re-positioning. A complete production measurement system has also been installed.

“The result is a compact, highly efficient and accurate dredging machine. These options have not previously been offered on a CSD 350, but having been developed for this order will now become standard options for future clients,” Damen said.

The dredger was towed to Delfzijl, a journey taking 48 hours, to await deployment while the booster stations were transported by road. Final assembly took a week, followed by a few days of testing, after which the dredger was fully operational.

The fulfilment of the order, including designing and installing the options, and general finishing, took just 3 months, Damen said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free