Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›Scarabeo 5 rig fire: Investigation reveals safety breaches
Exploration & Production

May 10, 2017 · about 9 years ago

Scarabeo 5 rig fire: Investigation reveals safety breaches

Norway’s offshore safety watchdog, the Petroleum Safety Authority (PSA), has completed its investigation of last year’s fire on the Scarabeo 5 rig and identified several safety breaches. To remind, the fire broke out in one of the engine rooms on the Saipem-owned Scarabeo 5 drilling rig on November

2 minutes read
  • LinkedIn
  • X
  • Email

Norway’s offshore safety watchdog, the Petroleum Safety Authority (PSA), has completed its investigation of last year’s fire on the Scarabeo 5 rig and identified several safety breaches.

To remind, the fire broke out in one of the engine rooms on the Saipem-owned Scarabeo 5 drilling rig on November 22, 2016 .

At the time, the rig was working for Statoil in the Njord field in the Norwegian Sea. However, Scarabeo 5 was not connected to a well at the time. The fire was caused by a leak in a diesel oil pipe associated with a generator and resulted in damage to equipment.

As a result of the incident, one person was sent to hospital suffering from smoke inhalation but was discharged the following day.

The regulator said on Wednesday that the investigation has concluded that Saipem has not implemented recommended modifications or conducted sufficient preventive maintenance to avoid leaks and vibration, and to ensure isolation of hot surfaces. Combined with weaknesses in the original design of the diesel piping, this led to a bolt fracture in a flange. That in turn resulted in diesel oil coming into contact with a hot surface and igniting.

The PSA further said that it identified several regulatory breaches during the investigation, including missing and inadequate barriers which could have prevented the incident. The safety body added that a number of underlying technical, organizational, and operational causes contributed to the incident.

Non-conformities found during the investigation include fire prevention measures in the engine room, maintenance management, the system for handling emergency responses, and the system for training and drills.

Also, the PSA’s investigation team identified improvement points related to management and systems as well as the system for following up supplier recommendations.

The safety regulator told Saipem to explain how these non-conformities will be handled and to give an assessment of the improvement points which have been identified.

Scarabeo 5 is a semi-submersible drilling rig of the ME 4500 type built by Fincantieri in Genoa in 1990 and operated by Saipem’s Norwegian branch.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

16 days ago