Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›New South Quay Project on Schedule
News

May 24, 2017 · about 9 years ago

New South Quay Project on Schedule

Piling work on the Poole Harbor’s £10 million new South Quay is in full swing and on schedule, reports the main contractor BAM Nuttall Ltd. The sole purpose of the project, according to Poole Harbor Commissioners (PHC) who awarded the contract, is to ensure that the port remains competitive with fac

1 minutes read
  • LinkedIn
  • X
  • Email

Piling work on the Poole Harbor’s £10 million new South Quay is in full swing and on schedule, reports the main contractor BAM Nuttall Ltd.

The sole purpose of the project, according to Poole Harbor Commissioners (PHC) who awarded the contract, is to ensure that the port remains competitive with facilities that can accommodate a much wider range of shipping and marine activities.

It will take approximately 1,800 tons of steel piles, all of which will be delivered by sea, to build this 200m long deep water quay. In addition, the majority of the material reclamation fill is to be taken directly from the port’s maintenance dredging scheme.

This approach removes the need for road deliveries and uses a ‘waste’ product in the new construction. And, in order to ensure that local companies benefit from this project, all marine plant has been sourced from suppliers in Poole and Southampton.

The project is due for completion by the end of 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free