Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›World’s largest semi-sub platform reaches Australia
News

May 29, 2017 · about 9 years ago

World’s largest semi-sub platform reaches Australia

Japan’s Inpex has informed that the central processing platform for the Ichthys gas field has arrived in the Australian waters of the Browse Basin today. The massive Ichthys Explorer platform weighing 120,000 tonnes and with topsides measuring 130 meters by 120 meters, is considered the world’s larg

2 minutes read
  • LinkedIn
  • X
  • Email

Japan’s Inpex has informed that the central processing platform for the Ichthys gas field has arrived in the Australian waters of the Browse Basin today.

The massive Ichthys Explorer platform weighing 120,000 tonnes and with topsides measuring 130 meters by 120 meters, is considered the world’s largest semi-submersible platform.

The Ichthys Explorer reached its final offshore destination, 220 kilometers off the north coast of Western Australia, where it will be located for 40 years.

“The safe completion of the 5,600 kilometer tow of the Ichthys Explorer from South Korea to the Ichthys Field, located 450 kilometers north of Broome, is another significant milestone for the Ichthys LNG Project,” Louis Bon , Managing Director, Ichthys Project stated.

“The successful 34 day tow is a tribute to our world-class processes and the commitment of our personnel from around the globe” Bon said. After the Ichthys Explorer is safely moored in the 250-meter deep waters of the Ichthys Field, hook up and commissioning will begin.

The CPF is the central hub for initial offshore processing of all well fluids delivered from an extensive, 130-kilometers network of subsea well infrastructure.

Gas from the CPF will be sent though an 890-kilometer subsea pipeline to the onshore LNG facility, at Bladin Point, near Darwin for processing.

Most condensate and water from the CPF will be transferred to a nearby floating production, storage and offloading facility (FPSO), the Ichthys Venturer.

“The Ichthys LNG Project incorporates some of the world’s largest and most advanced offshore facilities with a continuous operating life of 40 years,” Bon said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free