Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›McDermott Nets Angelin EPCIC Work from BP
Business & Finance

June 5, 2017 · about 9 years ago

McDermott Nets Angelin EPCIC Work from BP

McDermott has been awarded an engineering, procurement, construction, installation and commissioning (EPCIC) contract from BP Trinidad & Tobago (bpTT) for the Angelin gas field, located 40 kilometers off the east coast of Trinidad and Tobago. This EPCIC contract follows the completion of a multi-pha

2 minutes read
  • LinkedIn
  • X
  • Email

McDermott has been awarded an engineering, procurement, construction, installation and commissioning (EPCIC) contract from BP Trinidad & Tobago (bpTT) for the Angelin gas field, located 40 kilometers off the east coast of Trinidad and Tobago.

This EPCIC contract follows the completion of a multi-phase engineering contract, including pre-front end engineering design (pre-FEED), front-end engineering design (FEED), and pre-execution engineering contracts previously awarded by bpTT to McDermott for the initial design and execution planning of Angelin.

McDermott’s team in Houston led the engineering and execution planning efforts with support and work share from the company’s engineering center in Chennai, India.

“This is a great opportunity for us to build on the relationship and trust developed through the execution of the FEED for the Angelin project,” said Scott Munro , McDermott Vice President for Americas, Europe and Africa. “Through early engagement and aligning our respective goals, McDermott and bpTT have partnered to optimize the delivery of this very important project.”

McDermott will provide a turnkey EPCIC solution to design, procure, fabricate, transport, install and commission a six-slot wellhead platform and 26-inch (66 centimeter) subsea pipeline using its project management and engineering team in Houston. The 992-ton (900 metric ton) four-legged main pile jacket and 1,323-ton (1,200 metric ton) four-deck topside for the Angelin project will be constructed at the Altamira, Mexico fabrication facility. The platform and pipeline are scheduled to be installed by McDermott’s DLV 2000.

The Angelin project is a dry gas development within the northern Columbus Basin in 65 meters of water. The gas will be exported to the Beachfield/Atlantic LNG and the liquids to the Galeota terminal via a new 13 mile (21 kilometer), 26 inch (66 centimeter) diameter export pipeline. With a design throughput of 600 million standard cubic feet of gas per day, production will be exported through the pipeline to the Serrette Facility and on to the nearby Cassia platform for processing.

The lump sum contract award will be reflected in McDermott’s second quarter 2017 backlog.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free