Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›RRS Sir David Attenborough Construction Moves Forward
News

June 6, 2017 · about 9 years ago

RRS Sir David Attenborough Construction Moves Forward

Cammell Laird shipyard has reached the nine-month milestone in its project to build the UK’s new polar research ship, the RRS Sir David Attenborough. The ship has been commissioned by the Natural Environment Research Council (NERC), and it will be operated by British Antarctic Survey (BAS). Cammell

2 minutes read
  • LinkedIn
  • X
  • Email

Cammell Laird shipyard has reached the nine-month milestone in its project to build the UK’s new polar research ship, the RRS Sir David Attenborough.

The ship has been commissioned by the Natural Environment Research Council (NERC), and it will be operated by British Antarctic Survey (BAS).

Cammell Laird CEO John Syvret CBE said that since August 2016 1,800 tonnes of steel, out of a total of 5,200 tonnes, had been fabricated to make the hull of the ship, which carries the Cammell Laird hull number 1,390 and is due to enter service in 2019.

“The project has generated real momentum and we are pleased to be on time,” John Syvret said.

Cammell Laird managing director Linton Roberts added that important landmarks in the build so far include the testing and fitting of two Rolls-Royce drive propulsion motors weighing 115 tonnes.

Meanwhile, the ship’s stern thrusters have also been trialed and fitted to the ship. The two 1,576kw rated thrusters were made by North East manufacturer Tees White Gill.

“The next phases of the build will focus on the power of the ship, with four seven meter long electrical propulsion switchboards installed, together with four two metre long frequency converters,” said Linton Roberts . “We will then look at the moon pool structure, one of the most complex and innovative aspects of the ship’s design.”

In addition, the team is planning to install the nine and six cylinder Rolls-Royce engines in the ship shortly.

Cammell Laird has also been able to deploy its two new 15 tonne and 50 tonne cranes for steel production in its construction hall.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free