Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Huawei Marine Connects Ambergris Caye with Belize Mainland
Business & Finance

July 20, 2017 · about 9 years ago

Huawei Marine Connects Ambergris Caye with Belize Mainland

Belize Telemedia Ltd (BTL) and Huawei Marine have delivered Strategic Evolution Underwater Link (SEUL) project, bringing fiber-optic submarine cable connectivity to San Pedro, Ambergris Caye. Stretching over 23 kilometers from the Belize mainland to the Caye, this fiber optic connectivity will be in

2 minutes read
  • LinkedIn
  • X
  • Email

Belize Telemedia Ltd (BTL) and Huawei Marine have delivered Strategic Evolution Underwater Link (SEUL) project, bringing fiber-optic submarine cable connectivity to San Pedro, Ambergris Caye.

Stretching over 23 kilometers from the Belize mainland to the Caye, this fiber optic connectivity will be integral in the delivery of fast broadband speeds to the island.

With the installation of the submarine cable, BTL will now be able to offer its DigiNet Broadband product to the entire island of Ambergris Caye; with broadband speeds of up to 100 Mbps.

On June 23, 2017 Rochus Schreiber, CEO of BTL met with Daniel Guerrero the Mayor of San Pedro Town to discuss the coordinated efforts needed for the future works of fiber installation and the upcoming DigiNet plan offers. Residents and the business community can expect faster, more reliable and affordable broadband via fiber as early as August 2017.

Zhang Hongxiang , project director for Huawei Marine, said: “In order to protect the environment, our delivery team chose to enclose the entire installation area with a turbidity silt curtain to reduce the impact on the environment. The effective delivery of the project, not only reflects our customer-centric focus but is also the embodiment of Huawei Marine’s commitment to environmental and social responsibility.”

BTL’s CEO Rochus Schreiber , said: “The SEUL project is an important element of BTL’s transformative Network Evolution Plan, and its delivery permits world class high-speed network connection between Belize and the island of Ambergris Caye, which will significantly enhance the prospects for economic development on the Caye – and eventually throughout the country. This milestone would not have been possible without the incredible effort and dedication of both Huawei Marine’s professional delivery team and BTL’s Network Engineering Team.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free