Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›VIDEO: First Johan Sverdrup Jacket Lands on Seabed
Business & Finance

August 1, 2017 · about 9 years ago

VIDEO: First Johan Sverdrup Jacket Lands on Seabed

Jacket for the Johan Sverdrup riser platform was installed by Heerema Marine Contractors’ crane vessel Thialf. The jacket is stretching 140 metres from the seabed, where it covers an area measuring 94 times 64 metres. It is attached to the seabed by 24 poles weighing more than 9000 tonnes in total.

2 minutes read
  • LinkedIn
  • X
  • Email

Jacket for the Johan Sverdrup riser platform was installed by Heerema Marine Contractors’ crane vessel Thialf.

The jacket is stretching 140 metres from the seabed, where it covers an area measuring 94 times 64 metres. It is attached to the seabed by 24 poles weighing more than 9000 tonnes in total.

“This is a special milestone for us, because it is the first visible sign of the Johan Sverdrup field. I am happy that the installation has been carried out safely and fully in line with the plan. We are now looking forward to the next steps of this industrial adventure and the long line of major operations awaiting us. We have already done a lot of work on and below the seabed, and in the time ahead we will gradually become more visible above the sea surface as well,” says Kjetel Digre , project director for Johan Sverdrup.

Head of transport and installation on Johan Sverdrup Thor Kråkenes has followed the installation of the jacket that was delivered by Kværner Verdal.

“The execution of the work has simply been a feat of engineering. It took a lot of good work and detailed planning to prepare the careful lowering of the jacket onto the seabed without any unforeseen incidents,” says Kråkenes.

The topside is scheduled for installation next year, and production from the field is to start at the end of 2019. Plateau production is estimated at 40% of NCS oil production. Expected field life is 50 years and the ambition is a world class recovery rate of 70%. Recoverable resources are estimated to be between 2 and 3 billion barrels of oil equivalent.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free