Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›Triton Knoll Kicks Off Archaeological Campaign in Lincolnshire
Research & Development

August 2, 2017 · about 9 years ago

Triton Knoll Kicks Off Archaeological Campaign in Lincolnshire

Triton Knoll Offshore Wind Farm has begun an archaeological trial trenching campaign along the full route of the onshore export cable corridor in Lincolnshire.

1 minutes read
  • LinkedIn
  • X
  • Email

Triton Knoll has begun an archaeological trial trenching campaign which will cover the full route of the onshore export cable corridor in Lincolnshire.

The campaign started on Monday, 31 July, the developer of the 900MW offshore wind farm said. The works are being carried out by the Lincoln-based Allen Archaeology.

The proposed onshore export cable route is almost 60 kilometers in length and runs from the landfall location at Anderby Creek, through to Bicker Fen where the power generated by the offshore wind farm will ultimately connect into the national grid network.

The campaign also includes the landfall location, the onshore substation and the intermediate electrical compound sites.

It will involve digging around 300 trenches of approximately 2m wide by 30-50m long. These pre-construction investigations do not indicate the start of onshore construction activity and are required for archaeological purposes only, Triton Knoll said.

These works are required to ensure any sensitive archaeological sites are identified and discussed with agreed statutory Heritage consultees and the Lincolnshire County Archaeologist.

The Triton Knoll wind farm will be located approximately 32km off the Lincolnshire coast and 50km off the coast of North Norfolk. The wind farm is being developed as a joint venture between Innogy Renewables UK Ltd (innogy) (50%) and Statkraft (50%), with innogy managing the project on behalf of the partnership.

Onshore construction is expected to start in mid-2018, subject to the final investment decision.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

AUV can operate at depths of up to 6,000 meters collecting high-resolution data; Credit: Jørgen Ramse Vadla
Authorities & Government

Advanced underwater vehicle goes on first mission to chart Norwegian Sea’s subseascape

about 1 month ago

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

AUV can operate at depths of up to 6,000 meters collecting high-resolution data; Credit: Jørgen Ramse Vadla
Authorities & Government

Advanced underwater vehicle goes on first mission to chart Norwegian Sea’s subseascape

about 1 month ago
ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago