Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Port of Astoria Dredging Project up for Comment
Dredging

August 8, 2017 · about 9 years ago

Port of Astoria Dredging Project up for Comment

Te U.S. Army Corps of Engineers, Portland District, has received an application from the Port of Astoria for the Army permit, proposing the maintenance dredging of the West Basin Marina in Clatsop County, Oregon. According to the applicant, the purpose of the project is to conduct maintenance dredgi

1 minutes read
  • LinkedIn
  • X
  • Email

Te U.S. Army Corps of Engineers, Portland District, has received an application from the Port of Astoria for the Army permit, proposing the maintenance dredging of the West Basin Marina in Clatsop County, Oregon.

According to the applicant, the purpose of the project is to conduct maintenance dredging within the Port of Astoria West Marina moorage facility in order to maintain marina operability and longevity.

The West Basin Marina Maintenance Dredging project involves dredging up to 109,000 cubic yards of accumulated sediment from approximately 11.26 acres within the West Basin Marina over the course of 10 years in order to maintain the required moorage depth.

Up to 54,500 cubic yards of accumulated sediment would be dredged during the first year of the permit and up to 54,500 additional cubic yards would be dredged over the remaining 9 years of the requested 10 year permit.

The dredge depth would range from -6.0 to -17.0 feet Mean Lower Low Water (MLLW). The applicant would utilize a suction dredge operating from a floating barge while disposing of the dredged material in the flow lane of the Columbia River via a submerged pipe.

The Corps is soliciting comments on the proposed work in order to consider and evaluate the impacts of the proposed project. The deadline for sending comments is September 2, 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free