Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›All Hywind Scotland Floating Turbines Now In Place
News

August 16, 2017 · about 9 years ago

All Hywind Scotland Floating Turbines Now In Place

The final floating wind turbine for the Hywind Scotland project has been towed to the site and installed at its designated location off Peterhead, Scotland, according to BBC.

1 minutes read
  • LinkedIn
  • X
  • Email

The final floating wind turbine for the Hywind Scotland project has been towed to the site and installed at its designated location off Peterhead, Scotland, according to BBC .

Statoil has yet to respond to Offshore WIND’s request for confirmation.

The first electricity from the world’s first floating wind farm is expected to be produced in October.

The 30MW Hywind Scotland Pilot Park comprises five Siemens 6MW turbines mounted on a SPAR-type floating foundation.

The turbines are 253 meters tall from bottom to wing tip, of which 78 metres will be under water and 175 metres above, according to Statoil, which further added that the turbine has a rotor diameter of 154 metres, with each blade being 75 metres long and the nacelle big enough to park two double decker buses inside.

The floating substructures, built by the Spanish Navantia-Windar consortium, are 91 meters long and have a diameter of 14,4 metres.

The EUR 200 million project, which can provide 20,000 UK households with renewable energy, is owned by Statoil (75%) and Masdar (25%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free