Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Dredgers Essex and Charleston Gear Up for Delaware River Job
Dredging

August 22, 2017 · about 9 years ago

Dredgers Essex and Charleston Gear Up for Delaware River Job

The U.S. Coast Guard said in its latest announcement that they are establishing two safety zones to facilitate the deepening of the main navigational channel in the Delaware River on or about August 30, 2017, through March 15, 2018. During this time, the dredgers Essex and Charleston, owned by Norfo

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Coast Guard said in its latest announcement that they are establishing two safety zones to facilitate the deepening of the main navigational channel in the Delaware River on or about August 30, 2017, through March 15, 2018.

During this time, the dredgers Essex and Charleston, owned by Norfolk Dredging Company, will be dredging in Marcus Hook Range and Anchorage, Bellevue Range, Chester Range and Eddystone Range.

Safety zone one includes all the waters within a 250 yard radius of the dredgers, including all related dredge equipment.

According to the announcement, safety zone two will be in place only during the time the dredge Essex and/or Charleston is conducting dredging operations in Marcus Hook Anchorage.

The final contract

The U.S. Army Corps of Engineers last month awarded final contract for Delaware River deepening project – Upper Reach B – to Norfolk Dredging Company in the amount of $50.2 million.

This represents the 10th and final dredging contract for the Delaware River Main Channel Deepening Project, deepening the Delaware River federal navigation channel from 40 to 45 feet between Philadelphia and the sea.

The project is a joint effort of the Army Corps’ Philadelphia District and PhilaPort.

The Delaware River Main Channel Deepening project began in March of 2010. The deeper channel will provide for more efficient transportation of containerized, dry bulk (steel and slag) and liquid bulk (crude oil and petroleum products) cargo to and from the Delaware River ports.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free