Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Plymouth Dredging Plans on the Table
Dredging

August 23, 2017 · about 9 years ago

Plymouth Dredging Plans on the Table

The Town of Plymouth Department of Public Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. to dredge and do other work in Plymouth Harbor at Water Street and Town Wharf in Plymouth, Mass. The proposed work involves dredging

1 minutes read
  • LinkedIn
  • X
  • Email

The Town of Plymouth Department of Public Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. to dredge and do other work in Plymouth Harbor at Water Street and Town Wharf in Plymouth, Mass.

The proposed work involves dredging of approximately 1,500 cubic yards of material to approximately 5-6 feet below/waterward of the mean high water (MHW) elevation, the discharge of fill material into approximately 5,400 square feet (0.12) acre of tidal waters of the U.S. in order to facilitate expansion (relocation) of an existing 235-foot portion of a seawall approximately 15 feet seaward (NNE) of the existing high tide line.

The project also involve additional discharge of approximately 600 square feet of material (new riprap) for shoreline protection and stormwater improvements including relocation of an existing outfall.

All dredged material will either be reused onsite as fill material (to the extent practicable and permissible) or disposed of at a suitable upland site well-removed from waters of the U.S. Additional work includes installation of additional boardwalks, overlooks, parapets and other infrastructure improvements, according to USACE.

Public comments on this work proposed by the Plymouth Department of Public Works should be forwarded no later than September 21, 2017 to the New England District’s Regulatory Division, said USACE.

[mappress mapid=”24369″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free