Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Seals see no ‘barrier’ in SeaGen tidal turbine
Business & Finance

August 25, 2017 · about 9 years ago

Seals see no ‘barrier’ in SeaGen tidal turbine

A new study has found that the presence of SeaGen tidal turbine in Strangford Lough in Northern Ireland did not prevent harbor seals from passing through the channel, detecting some small effects in their movement associated with the device.

2 minutes read
  • LinkedIn
  • X
  • Email

A new study has found that the presence of SeaGen tidal turbine in Northern Ireland did not prevent harbor seals from passing through the channel, detecting only small effects in their movement associated with the device.

The study, conducted by SMRU Consulting with the Sea Mammal Research Unit, explored how the presence of a tidal turbine might affect the movement of harbor seals by analyzing tracking data from resident seals, before, during and after the installation of SeaGen in the Strangford Lough.

Data obtained from 32 electronic tags showed the SeaGen turbine did not prevent transit of the animals through the channel and therefore did not result in a ‘barrier’ effect, according to the study.

However, the animals’ behavior did change when the turbine was operating as the seals would swim past the turbine slightly less often, demonstrating the importance of allowing for behavioral responses when estimating collision risks associated with tidal turbines.

The study found that seals appeared to give the turbine a wide berth, typically passing either side of it by a few hundred meters, showing some degree of local avoidance compared with the pre-installation results.

“This study only looked at the effects of a single turbine rather than an array, and mitigation limited the ability to determine close range interactions. However, the study indicates that the effect of the turbine on Strangford Lough harbor seals was minor and that collision risk was reduced by the behavior of the seals,” the study states.

The research was commissioned due to concerns about the risk to seals posed by operating tidal turbines.

Having provided extensive engineering and environmental learning for the tidal energy industry, the SeaGen tidal turbine has reached the end of its operational life and will be removed from the Strangford Narrows over the winter of 2017/18.

Atlantis Resources became the owner of SeaGen in 2015 by having acquired Marine Current Turbines (MCT) from Siemens.

The 1.2 MW SeaGen tidal device was installed in 2008, and has since generated 10GWh of electricity from tides. The system consists of twin turbines, 600kW in capacity each, mounted on a crossbeam. The rotor diameter of each turbine is 16 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEnvironmentOperations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago