Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Sea Challenger Loads Final Dudgeon Turbine Parts in Hull
News

August 29, 2017 · about 9 years ago

Sea Challenger Loads Final Dudgeon Turbine Parts in Hull

A2SEA’s wind turbine installation vessel Sea Challenger has loaded the final set of wind turbine components for the 402MW Dudgeon offshore wind farm project at the Port of Hull.

1 minutes read
  • LinkedIn
  • X
  • Email

A2SEA’s wind turbine installation vessel Sea Challenger has loaded the final set of wind turbine components for the 402MW Dudgeon offshore wind farm project at the Port of Hull.

In total, the vessel made 17 runs between the load out port in Hull and the installation site some 32 kilometres off North Norfolk to install all of the wind farm’s 67 Siemens 6MW turbines. The first turbines were installed at the site in early January 2017.

Sea Challenger had also served as an accommodation vessel on the project from September 2016 to the end of the year.

The Dudgeon offshore wind farm is a GBP 1.5 billion project being jointly developed by Statoil, Masdar and Statkraft, expected to be fully commissioned by late 2017.

Statoil is developing the Dudgeon offshore wind farm and will continue as its operator.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free