Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Final Dudgeon Turbine Takes Shape
News

September 5, 2017 · about 9 years ago

Final Dudgeon Turbine Takes Shape

A2SEA’s wind turbine installation vessel Sea Challenger has installed the last of the 67 Siemens 6MW wind turbines on the 402MW Dudgeon offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

A2SEA’s wind turbine installation vessel Sea Challenger has installed the last of the 67 Siemens 6MW wind turbines on the 402MW Dudgeon offshore wind farm.

The vessel loaded the first turbine parts at the Port of Hull and installed them at the site some 32 kilometres off North Norfolk in January 2017.

The wind farm started delivering electricity to the National Grid in early February.

The Dudgeon offshore wind farm is a GBP 1.5 billion project being jointly developed by Statoil, Masdar and Statkraft, expected to be fully commissioned by late 2017.

Statoil is developing the Dudgeon offshore wind farm and will continue as its operator.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free