Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›CPRA Gets $14.2M Grant for River Reintroduction Project
Dredging

September 19, 2017 · about 9 years ago

CPRA Gets $14.2M Grant for River Reintroduction Project

The Louisiana Coastal Protection and Restoration Authority (CPRA) has been awarded a $14.2 million grant from the Gulf Coast Ecosystem Restoration Council for the Mississippi River Reintroduction into Maurepas Swamp project. This project is one of seven projects the RESTORE Council has selected for

1 minutes read
  • LinkedIn
  • X
  • Email

The Louisiana Coastal Protection and Restoration Authority (CPRA) has been awarded a $14.2 million grant from the Gulf Coast Ecosystem Restoration Council for the Mississippi River Reintroduction into Maurepas Swamp project.

This project is one of seven projects the RESTORE Council has selected for funding under its Initial Funded Priorities List that will directly benefit Louisiana.

The Maurepas Swamp is located west of Lake Pontchartrain and is one of the largest areas of forested wetlands along the Gulf Coast, encompassing approximately 57,000 hectares of bald cypress-tupelo swamp.

Extensive man-made changes to the historical flood plain of the Lower Mississippi River have affected the health and stability of this area by reducing the influx of sediments that are essential for offsetting subsidence and the lack of freshwater.

The River Reintroduction into Maurepas Swamp project is being designed to construct a 2,000 cubic feet per second gated structure in the Mississippi River and five miles of conveyance channel near Garyville to reconnect the river to the swamp and improve the health and longevity of this ecosystem.

This project will be the first dedicated river diversion project into the forested wetlands of Louisiana designed specifically for swamp forest restoration, with the goal being to reduce or minimize loss of swamp forest habitat in the project area through the reintroduction of Mississippi River water.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free