Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Awards Tampa Harbor Maintenance Dredging Contract
Dredging

September 29, 2017 · about 9 years ago

USACE Awards Tampa Harbor Maintenance Dredging Contract

The U.S. Army Corps of Engineers, Jacksonville District, announces the Tampa Harbor Maintenance Dredging contract award of $3.6 million to Coastal Dredging Company, Inc., of Hammond, Louisiana. The Corps awarded the contract September 22 and they anticipate that the construction will start in Novemb

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District, announces the Tampa Harbor Maintenance Dredging contract award of $3.6 million to Coastal Dredging Company, Inc., of Hammond, Louisiana.

The Corps awarded the contract September 22 and they anticipate that the construction will start in November and finish within six months.

The work consists of maintenance dredging shoal material from two channels to return them to their authorized depths. It includes dredging the Alafia River channel and turning basin to 32 feet, and the Manatee Harbor entrance channel and turning basin to 40 feet.

“Managing sediment on a regional scale results in significant cost savings and environmental benefits, so we combined the two authorized projects,” Project Manager, Brandon Burch, said.

The accumulation of sediment, commonly called shoaling, restricts navigation by reducing both channel width and depth. Minimum depths recorded from the channels are less than the authorized depths and are causing navigation restrictions for commercial vessels. Periodic dredging maintains the channels at their federally authorized depths for navigation purposes, said USACE.

The maintenance will remove roughly 200,000 cubic yards of material in total.

Coastal Dredging Company will place all material from the Alafia River dredging in a permitted disposal area located in Tampa Bay. They plan to dredge material from Manatee Harbor and place it in a designated upland disposal area. Contract work also includes turbidity monitoring, endangered species monitoring, and more.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free