Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Half of Galloper Turbines Up
News

October 10, 2017 · about 9 years ago

Half of Galloper Turbines Up

Swire Blue Ocean’s wind turbine installation vessel (WTIV) Pacific Orca has installed 28 out of 56 turbines at the 336MW Galloper offshore wind farm, innogy reported via social media.

1 minutes read
  • LinkedIn
  • X
  • Email

Swire Blue Ocean’s wind turbine installation vessel (WTIV) Pacific Orca has installed 28 out of 56 turbines at the 336MW Galloper offshore wind farm, innogy reported via social media.

The vessel installed the first turbine at the site on 16 May 2017. Earlier in September, Fred. Olsen Windcarrier’s Bold Tern also joined the project to help out with the works and ensure a timely completion.

Siemens Gamesa, whose 6MW wind turbines will spin at the wind farm, contracted Swire Blue Ocean to provide a WTIV for Galloper in November 2015. In August 2016, Siemens chose the Peel Ports Great Yarmouth as the assembly location and installation base for the project.

Along with the delivery of the wind turbines, Siemens Gamesa is also in charge of their maintenance for a period of 15 years, once the project is operational.

The Galloper offshore wind farm, an extension of the Greater Gabbard, is expected to be commissioned in early 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free