Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Watermaster Dredgers Busy at Lake Manzala
Dredging

October 11, 2017 · about 9 years ago

Watermaster Dredgers Busy at Lake Manzala

Four Watermaster dredgers have been brought from Finland to improve the environmental condition of the Northern Lakes (lagoons) of Egypt. The Nile Delta estuarine with its wetlands, lakes and lagoons forms a transitional water purification and protective zone before the Mediterranean Sea. This zone

1 minutes read
  • LinkedIn
  • X
  • Email

Four Watermaster dredgers have been brought from Finland to improve the environmental condition of the Northern Lakes (lagoons) of Egypt.

The Nile Delta estuarine with its wetlands, lakes and lagoons forms a transitional water purification and protective zone before the Mediterranean Sea. This zone is a productive agricultural and aquacultural area, as well as an important sink of nutrients, heavy metals and agro-chemicals.

High population growth and population pressure on the scarce inhabitable land of Egypt with increasing agriculture and industrialization have resulted in pollution of drains and subsequently the lagoons.

Lake Manzala is the largest of the lakes and produces the most fish. The size of the lake is about 52 611 hectares. The Lake is shallow with half of the lake being only 0,5-1,00m deep. There are three outlets between Lake Manzala and the Mediterranean sea.

The overall objective of the dredging project is improved environmental status of Lake Manzala. This would result in a significant increase in sustainable fish production thus supporting the livelihood of the local population.

The project has three results areas:

1. Dredging operations planned according to standards and environmentally friendly practices;

2. Water circulation, temperature, salinity and suspended solids 3D model applied and, based on it, guidelines for sustainable dredging prepared;

3. Plan for Lake Manzala joint operational monitoring and data management system and recommendations for its implementation prepared.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free