Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Ørsted Wraps Up Hornsea Three Cable Corridor Talks
Storage

December 25, 2017 · about 8 years ago

Ørsted Wraps Up Hornsea Three Cable Corridor Talks

Ørsted has closed further statutory consultation for the proposed Hornsea Project Three offshore wind farm project.

2 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has closed further statutory consultation for the proposed Hornsea Project Three offshore wind farm project.

Following the statutory consultation on the project held from July to September 2017, Ørsted proposed modifications to the onshore and offshore cable corridor for the Hornsea Project Three.

The previous round of consultation encompassed a 1.5 kilometre wide offshore cable corridor search area and a 200 metre wide onshore cable corridor search area, within which an 80-metre wide refined onshore cable corridor, along with associated access routes and storage areas, would be located.

Following the first round of consultation, Ørsted proposed works beyond the 200-metre-wide onshore cable corridor, as well as two potential offshore cable re-routes beyond the search area presented earlier this year. The developer also identified new access routes, potential storage areas, potential visual screening and potential footpath diversion areas.

The further statutory consultation was targeted at those who either have an interest in the land and/or are affected by any works now proposed beyond the previously proposed areas or whose interest in land was established after the previous round of consultation, the developer said.

Ørsted is currently processing the received feedback and expects to publish ”refined plans in the New Year.”

The Hornsea Project Three wind farm is located some 120 kilometres off the north Norfolk coast, UK. If built to full capacity, the wind farm will be capable of generating up to 2.4GW of electricity.

The project is currently in the pre-application phase, with a Development Consent Order (DCO) application expected to be submitted in the second quarter of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago