Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Ørsted Wraps Up Hornsea Three Cable Corridor Talks
Wind Farms

December 25, 2017 · about 8 years ago

Ørsted Wraps Up Hornsea Three Cable Corridor Talks

Ørsted has closed further statutory consultation for the proposed Hornsea Project Three offshore wind farm project.

2 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has closed further statutory consultation for the proposed Hornsea Project Three offshore wind farm project.

Following the statutory consultation on the project held from July to September 2017, Ørsted proposed modifications to the onshore and offshore cable corridor for the Hornsea Project Three.

The previous round of consultation encompassed a 1.5 kilometre wide offshore cable corridor search area and a 200 metre wide onshore cable corridor search area, within which an 80-metre wide refined onshore cable corridor, along with associated access routes and storage areas, would be located.

Following the first round of consultation, Ørsted proposed works beyond the 200-metre-wide onshore cable corridor, as well as two potential offshore cable re-routes beyond the search area presented earlier this year. The developer also identified new access routes, potential storage areas, potential visual screening and potential footpath diversion areas.

The further statutory consultation was targeted at those who either have an interest in the land and/or are affected by any works now proposed beyond the previously proposed areas or whose interest in land was established after the previous round of consultation, the developer said.

Ørsted is currently processing the received feedback and expects to publish ”refined plans in the New Year.”

The Hornsea Project Three wind farm is located some 120 kilometres off the north Norfolk coast, UK. If built to full capacity, the wind farm will be capable of generating up to 2.4GW of electricity.

The project is currently in the pre-application phase, with a Development Consent Order (DCO) application expected to be submitted in the second quarter of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free