The Australia Pacific liquefied natural gas (LNG) export plant located on Curtis Island in Queensland will shut down for planned maintenance in March and April.
The two-train 9 mtpa liquefaction plant will close one train on March 8-23 and the other on April 14-29, according to a notice submitted to the Australian Energy Market Operator (AEMO).
Australia Pacific LNG is a joint venture between ConocoPhillips (37.5%), Origin (37.5%) and Sinopec (25%).
Origin is responsible for the operation of the APLNG gas fields and main gas transmission pipeline while ConocoPhillips operates the LNG facility.
LNG World News Staff