Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Santos GLNG project ships 89 cargoes in 2017
Ports & Logistics

January 24, 2018 · about 8 years ago

Santos GLNG project ships 89 cargoes in 2017

The Santos-operated GLNG project on Curtis Island near Gladstone, Queensland, shipped a total of 89 cargoes during 2017.

1 minutes read
  • LinkedIn
  • X
  • Email

The Santos-operated GLNG project on Curtis Island near Gladstone, Queensland, shipped a total of 89 cargoes during 2017, 14 more than in 2016.

LNG production at the plant rose 15 percent in 2017 to 5.2 million tons, compared to 4.5 million tons in 2016, Santos said in its quarterly report.

During the fourth quarter, the project reached a maximum daily rate of 8.9 mtpa, 14 percent above nameplate capacity. LNG production and sales volumes were higher than the previous quarter primarily due to gas purchases from QGC during their planned LNG plant shutdown in October, Santos said.

Upstream equity sales gas production remained steady relative to the previous quarter, as stronger Roma production offset slightly lower Fairview production. 172 new wells were drilled in 2017 and 200 new wells connected.

The ConocoPhillips-operated Darwin LNG project shipped 51 cargoes, six below the 2016 figures.

LNG sales volumes and production rose in the fourth quarter of 2017 compared to the previous quarter. Santos reminded that a two-well appraisal campaign on the Barossa field resulted in a 35 percent increase in the 2C resource base and strengthened the field’s position as the lead candidate for Darwin LNG backfill. A FEED-entry decision on a Barossa development is targeted for the second quarter of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago