Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Beatrice Schedules First Power for July
Business & Finance

January 29, 2018 · about 8 years ago

Beatrice Schedules First Power for July

The 588MW Beatrice offshore wind farm is expected to produce first electricity in July this year, SSE, one of the owners of the wind farm, said.

1 minutes read
  • LinkedIn
  • X
  • Email

The 588MW Beatrice offshore wind farm is expected to produce first electricity in July this year, SSE, one of the owners of the wind farm, said.

SSE emphasises that there remains a lot to be done before the first power: commissioning the Blackhillock substation, completing the subsea and onshore cabling, energising the transmission system, completing jacket installation and erecting the first of the 84 Siemens 7MW turbines.

Recently, the jacket foundation for a Siemens Offshore Transformer Module (OTM) started its journey to the Beatrice wind farm, after undergoing final preparations at BiFab’s yard in Fife, Scotland.

In 2016, Siemens won a contract to supply, install and commission 84 7MW wind turbines, and provide grid access solution for the wind farm, which will feed the power to the grid through Nexans’ export cable .

The cable laying vessel Siem Aimery, supported by CSV Siem Stingray, laid and trenched 16 inter-array cables in its first campaign covering 24 connections, after which the vessels left the site. Siem Aimery will resume works around 1 March.

The wind farm is being developed by Beatrice Offshore Windfarm Ltd., a joint venture partnership between SSE, Copenhagen Infrastructure Partners and Red Rock Power Ltd.

It is scheduled to become fully operational in 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEnvironmentOperations & MaintenanceResearch & DevelopmentStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago