Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Pleasant Point Shoreline Protection Project up for Comment
Dredging

January 29, 2018 · about 8 years ago

Pleasant Point Shoreline Protection Project up for Comment

The U.S. Army Corps of Engineers, New England District, is working on a project that will stabilize approximately 1,500 feet of shoreline at the Pleasant Point Reservation home to members of the federally recognized Passamaquoddy Tribe. According to the Corps, the purpose of the proposed project is

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is working on a project that will stabilize approximately 1,500 feet of shoreline at the Pleasant Point Reservation home to members of the federally recognized Passamaquoddy Tribe.

According to the Corps, the purpose of the proposed project is to prevent ongoing shoreline erosion in front of tribal housing, a church and a senior center at the Pleasant Point Reservation by constructing a 1,500 ft. long rip-rap revetment.

If the areas are not protected from further shoreline erosion, there will be adverse impacts to the tribal owned facilities, USACE reported.

The 36 ft. wide stone rip-rap revetment design consists of a geotextile fabric overlain by an 18-inch layer of core stone, an 18-inch layer of under stone and a 42-inch thick layer of armor stone rip-rap on a 1:1.5 vertical to horizontal slope.

The proposed revetment will tie into the southern section of a newly constructed 300 ft. revetment in front of the tribal owned waste water treatment plant.

The construction project is expected to take four to six months.

Deadline for sending comments on the proposed scheme is February 27, 2018.

[mappress mapid=”24816″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free